BRC

Building, Remodeling & Custom Cabinetry (210) 825-8243

Home     About Us     Contact Us     Site Map     Services     Gallery     Customer Reviews     FAQ     Roll Out Shelves      
Before

 

After

After 2

NEXT

We really enjoyed this 1/2 bath project!  In the "before" the old sink, counter top, light, and mirror are still in place. In the "after" the owner chose to eliminate the old cabinet and have us install a new pedistal sink to open up the small bath a bit. We also installed a new decorative mirror, new faucet, new light, new toilet, new cabinet over the toilet, new door unit, new flooring, crown molding, new base board and paint the entire bath. It turned out great!